Pakistan customer visit our factory to talk business with us.
We can get invitation letter to our respected customer to visit our factory and company, also bring them to understand a lot of different Chinese culture.
1. Grade: U71Mn
2. Size: 118.1kg/m
3. Standard: YBT5055-93
4. Certification: COQ, third party inspection
Product Name | QU120/KP120 crane rail |
Material | U71Mn |
Holes | Without |
Standard | YB (GB) |
Grade | 260HB |
Brade | Hangang |
Yueqi steel | |
Usage | Overhead or ground crane moving |
We can accept any inspection as customer's request, even Lloyd's Register we had passed through it
Our steel rail can be transported by train , so as to keep the land transportation safely and quickly
We use container for little quantity, and use bulk cargo for large to save the cost of loading and unloading
Hot rolled steel rail producing line
Packing Details : In bundle, one bale less than 3 tons, for bulk cargo less than 5 tons.
Delivery Details : 15-30 days after get your L/C or prepayment.
Lloyd's Register's inspector spent four days to inspect the whole producing process of 500 tons BS90A steel rail that we sold to Pakistan, the quality is good and we pass through their inspection to get the inspection certificate.
Pakistan customer visit our factory to talk business with us.
We can get invitation letter to our respected customer to visit our factory and company, also bring them to understand a lot of different Chinese culture.
We also go to visit our customer to talk business with them, also supply technology service or after sales service.
We had done business with Kayson co. on the year of 2010, we have a lot of good relation and friend in Iran, we visit them one to two times every year, also have a lot of business cooperation in Iran.
A: We have factory, but Yueqi just be our export company of Shanghai, Yueqi is good at communication with customer, also Shanghai is the most famous city in the world, the traffic is very convenience, so Shanghai is a best place for international trading.
A: For normal Chinese standard rail, we always have stock, we can deliver it timely, because we need book the container before one week, normally we can deliver it within ten working days;
If it is international standard rail, if we have the mold, the MOQ should be 400 tons, we can deliver it within 30-45 days, if the payment is letter of credit, the deliver time should be 60 days, because we need ensure the safe recovery of funds;
If it is special type of rail, we need open mold to produce it, the MOQ should be more than 1000 tons, the deliver time should be 60 days.
A: Normally steel rail all be standard product, if we know the drawing and material, we will understand all of it, professional does not need sample again. If it is special product, usually we need make mold to produce it, so we don't have sample before we open mold.
For special requirement, we can supply sample, it is free charge, but buyer should pay for the transportation charge.
A: Usually we would like to get 100% L/C, for little payment, we would like to get T/T 30 in advance, the balance against the copy of B/L at sight. Also we can provide Trade Assurance to your prepayment.
Copyright © 2020 Zhengzhou Deyuan Fine Chemicals Co., Ltd. | All Rights Reserved